PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

1st floor Detention cell divider wall Facing West.jpg Block work at the Sally Port Facing West.jpg Installing copper piping at the 1st floor locker room 133-136Facing North-West.jpg Started installing copper piping at the 1st floor locker room Facing West.jpg Aligning the stone panels at the 3rd floor Facing North.jpg Aligning the stone panels at the lower roof Facing East.jpg Duct work fitters at the 3rd floor Facing West.jpg
Previous pageNext page Installing copper piping at the 1st floor locker room 133-136Facing North-West
Installing copper piping at the 1st floor locker room 133-136Facing North-West